REQUEST FOR PROPOSAL (RFP) 

January 8, 2024

Job Overview

  • Date Posted
    January 8, 2024
  • Location
  • Expiration date
    January 14, 2024
  • Experience
    2 Years
  • Gender
    Both
  • Organization
    Jhpiego
  • Required Languages
    English

Job Description

REQUEST FOR PROPOSAL (RFP) 

Design, Supply, Installation & Delivery of Structured Network, for Jhpiego Sierra Leone Office 

NAME & ADDRESS OF FIRM  DATE: January 4, 2024
REFERENCE: RFP/ICT/FY24/001

 

Dear Sir / Madam: 

We kindly request you to submit your Proposal for the Design, Supply, installation & Delivery of  Structured Network, Jhpiego Sierra Leone office

Please be guided by the embedded form as Annexes, in preparing your Proposal.  

Proposals may be submitted on or before 4 P.M. on Sunday, January 14, 2024 and in a sealed envelope  addressed to to: 

Jhpiego Sierra Leone 

1 Sonia Drive (Back of City Super Market) 

Hill Station, Freetown 

Att: Procurement Consultant 

  

Your Proposal must be expressed in English, and valid for a minimum period of 90 days 

In the course of preparing your Proposal, it shall remain your responsibility to ensure that it reaches the  address above on or before the deadline. Proposals that are received by Jhpiego after the deadline  indicated above, for whatever reason, shall not be considered for evaluation. If you are submitting your  Proposal by email, kindly ensure that they are signed and in the .pdf format, and free from any virus or  corrupted files. 

Services proposed shall be reviewed and evaluated based on completeness and compliance of the  Proposal and responsiveness with the requirements of the RFP and all other annexes providing details of  Jhpiego requirements.  

The Proposal that complies with all the requirements, meets all the evaluation criteria and offers the best  value for money shall be selected and awarded the contract. Any offer that does not meet the  requirements shall be rejected. 

Any discrepancy between the unit price and the total price shall be re-computed by Jhpiego, and the unit  price shall prevail and the total price shall be corrected. If the Service Provider does not accept the final  price based on Jhpiego’s re-computation and correction of errors, its Proposal will be rejected.  

No price variation due to escalation, inflation, fluctuation in exchange rates, or any other market factors  shall be accepted by Jhpiego after it has received the Proposal. At the time of Award of Contract or  Purchase Order, Jhpiego reserves the right to vary (increase or decrease) the quantity of services and/or 

goods, by up to a maximum of ten percent (10%) of the total offer, without any change in the unit price  or other terms and conditions.  

Any Contract or Purchase Order that will be issued as a result of this RFP shall be subject to the General  Terms and Conditions of Jhpiego. The mere act of submitting a Proposal implies that the Service  Provider accepts the General Terms and Conditions of Jhpiego. 

Please be advised that Jhpiego is not bound to accept any Proposal, nor award a contract or Purchase  Order, nor be responsible for any costs associated with a Service Provider’s preparation and submission  of a Proposal, regardless of the outcome or the manner of conducting the selection process.  

Jhpiego’s vendor protest procedure is intended to afford an opportunity to appeal for persons or firms  not awarded a Purchase Order or Contract in a competitive procurement process. In the event that you  believe you have not been fairly treated, you can reach out to our compliance department to investigate. 

Jhpiego encourages every prospective Service Provider to prevent and avoid conflicts of interest, by  disclosing to Jhpiego if you, or any of your affiliates or personnel, were involved in the preparation of the  requirements, design, cost estimates, and other information used in this RFP.  

Jhpiego implements a zero tolerance on fraud and other proscribed practices, and is committed to  preventing, identifying and addressing all such acts and practices against Jhpiego, as well as third parties  involved in Jhpiego activities. Jhpiego expects its Service Providers to adhere to the Jhpiego Supplier Code  of Conduct. 

Thank you and we look forward to receiving your Proposal. 

Sincerely yours, 

Jusu Aruna 

Procurement Consultant 

04/01/2024

Annex 1 

Description of Requirements 

Context of the  

Requirement

Design, Supply, Installation & Delivery of Structured Network for Jhpiego Sierra  Leone Office .
Brief Description of  the Required  

Services

The contractor will be responsible for the design, supply, installation and delivery  of structured network infrastructure for the above-mentioned office site in  accordance with the requirements stated in this document. The contractor is  expected to propose and submit a comprehensive structured cabling solution by  analyzing the requirement, provide the necessary materials.
List and  

Description of  

Expected Outputs to be Delivered

Analyze and identify the structured cabling requirement of the Jhpiego  office and propose a comprehensive cabling solution. Contractor shall  submit detailed scope of work for proposed solution. This shall include  all wiring diagrams, description of materials to be used to produce the  structured cabling infrastructure and timeline for major tasks of the  Work. 

Supply and install a Fiber cable to connect core and access switches on  each floor in the building The fiber cable should be installed redundantly  to maximize the reliability.  

Supply and install CAT6 UTP cable (full copper) that will be used for  horizontal cabling from each wiring closet to each endpoint.  

Supply and install a single PVC trunk for all Network cables, which is  clearly separated by a partition. 

Centralize CAT6 in a patch panel located on third floor. 

Install the appropriate number of wireless access points on each floor to  allow full access by users using Jhpiego’s ERP systems

Person to  

Supervise the  

Work/Performance  of the Service  

Provider

IT Officer
Frequency of  

Reporting

Daily from project start to finish
Location of work  Jhpiego Country Office
Expected duration  of work Three working weeks
Target start date  February 01, 2024
Latest completion  date February 015, 2024
Travels Expected  Not Applicable 
Implementation  Schedule indicating  breakdown and  

timing of  

activities/sub 

activities

Required

 

Names and  

curriculum vitae of  individuals who  

will be involved in  completing the  

services

Required
Currency of  

Proposal

Sierra Leone Leones (SLL)
Value Added Tax  on Price Proposal must be exclusive of GST and other applicable indirect taxes
Validity Period of  Proposals  

(Counting for the  last day of  

submission of  

quotes)

90 days 

In exceptional circumstances, Jhpiego may request the Proposer to extend the  validity of the Proposal beyond what has been initially indicated in this RFP. The  Proposal shall then confirm the extension in writing, without any modification  whatsoever on the Proposal. 

Partial Quotes  Not permitted
Payment Terms  Through bank transfer and upon satisfactory completion of work
Person(s) to  

review/inspect/  

approve  

outputs/completed  services and  

authorize the  

disbursement of  payment

IT Officer 

Procurement staff 

Logistics staff

Criteria for  

Contract Award

Lowest Price Quote among technically responsive offers 

Full acceptance of the Jhpiego Contract Terms and Conditions. This is a  mandatory criterion and cannot be deleted regardless of the nature of the  services required. Non-acceptance of Jhpiego Contract Terms and Conditions  may be grounds for the rejection of the Proposal.

Criteria for the  

Assessment of  

Proposal 

Technical Proposal (70%) 

Presentation of company registration documents, City Council, NASSIT & NRA  and National ID/Passport for individual Consultant 20%  

Expertise of the Firm 20%  

Methodology, Its Appropriateness to the Condition and Timeliness of the  Implementation Plan 30% 

Financial Proposal (30%) 

To be computed as a ratio of the Proposal’s offer to the lowest price among the  proposals received by Jhpiego.

Jhpiego will award  the contract to: One and only one Service Provider

 

4

Type of Contract to  be Signed Purchase Order or Contract
Contract General  Terms and  

Conditions

General Terms and Conditions for contracts (goods and/or services)
Annexes to this  

RFP

Form for Submission of Proposal (Annex 2) 

Detailed TOR  

Others BoQ

Contact Person for  Inquiries 

(Written inquiries  only)

Procurement Consultant 

arunajusu@gmail.com 

Any delay in responding to emails shall not used as a reason for extending the  deadline for submission, unless Jhpiego determines that such an extension is  necessary and communicates a new deadline.

Other Information  site visit For a clearer picture of work, interested vendors are encouraged to visit the  office and conduct their own assessment on the 10th and 11th January, 2024
Origin of products  Chinese products are prohibited and can not be used to install the Jhpiego  Network

 

5

Annex 2 

FORM FOR SUBMITTING SERVICE PROVIDER’S PROPOSAL1 

(This Form must be submitted only using the Service Provider’s Official Letterhead/Stationery2

[insert: Location]

[insert: Date] 

To: Procurement Committee, Jphiego Sierra Leone 

Dear Sir/Madam: 

We, the undersigned, hereby offer to render the following services to Jhpiego in  conformity with the requirements defined in the RFP dated [specify date] , and all of its  attachments, as well as the provisions of the Jhpiego Contract Terms and Conditions of service: 

  1. Qualifications of the Service Provider 
The Service Provider must describe and explain how and why they are the best entity that can deliver the requirements of Jhpiego by indicating the following: 

a) Profile – describing the nature of business, field of expertise, licenses, certifications,  accreditations; 

b) Business Licenses – Registration Papers, Tax Payment Certification, etc. 

c) Track Record – list of clients for similar services as those required by Jhpiego, indicating  description of contract scope, contract duration, contract value, and contact references; d) Certificates and Accreditation – including Quality Certificates, Patent Registrations,  Environmental Sustainability Certificates, etc.  

e) Written Self-Declaration that the company is not on Jhpiego’s blacklisted vendors

 

  1. Proposed Methodology for the Completion of Services 
The Service Provider must describe how it will address/deliver the demands of the RFP; providing a  detailed description of the essential performance characteristics, reporting conditions and quality  assurance mechanisms that will be put in place, while demonstrating that the proposed  methodology will be appropriate to the local conditions and context of the work.

 

  

1 This serves as a guide to the Service Provider in preparing the Proposal.  

2 Official Letterhead/Stationery must indicate contact details – addresses, email, phone and fax numbers – for  verification purposes 

  1. Qualifications of Key Personnel  
If required by the RFP, the Service Provider must provide: 

a) Names and qualifications of the key personnel that will perform the services indicating who is  Team Leader, who are supporting, etc.; 

b) CVs demonstrating qualifications must be submitted if required by the RFP; and  c) Written confirmation from each personnel that they are available for the entire duration of the  contract.

 

  1. Cost Breakdown by Cost Component [This is only an Example]
Description of Networking Material  Unit Cost  Total 
GST
Total

 

Annex 3

Terms of reference (TOR) 

OBJECTIVE 

The Project Aims to Design, Supply, Install and Delivery of structured Network, infrastructure for the  Jhpiego office. The structured network system facility shall: 

  • Provide user-friendly environment with efficient, less technical support and open to performance  upgrade/future expansion and can accommodate efficiently all data transmission services to the  workstations. 
  • Facilitate efficient communication; 
  • Provide high-speed network connectivity to every floor of the building; 
  • Provide a system that supports video app like Microsoft Teams and is strong enough to support  Jhpiego’s ERP system 

SCOPE OF WORK 

The contractor will be responsible for the design, supply, installation and delivery of structured network infrastructure for the above-mentioned office site in accordance with the requirements stated in this  document. The contractor is expected to propose and submit a comprehensive structured cabling solution  by analyzing the requirement, accessing the office and providing the necessary materials as indicated in  their bill of materials and carrying out the installation work as the per proposal. The Scope of work is  limited to structural cable installation and does not include provision and configuration of the network  equipment.  

The server rooms are located on the second floor of the building. The server room houses the Central  UPS, network equipment such as Switches, Routers, ISP internet link, Servers and other network  peripherals. The network cables will be terminated on patch panels in the server room located on the  second floor of the building. 

DELIVERABLES 

  • Analyze and identify the structured cabling requirement Jhpiego Sierra Leone office and propose  a comprehensive cabling solution. The contractor shall submit a detailed scope of work for the  proposed solution. This shall include all wiring diagrams, description of materials to be used to  produce the structured cabling infrastructure and timeline for each and every task of the Work. 
  • Supply and install CAT6 UTP cable (full copper) that will be used for horizontal cabling from each  wiring closet to each endpoint.  
  • Supply and install a single PVC trunk for all Networks to cover the cables installed. Centralize CAT6 in a patch panel located on the second floor of the building. Install wiring cabinet (available in-house), install patch panels, terminate data cables on the patch  panel, and label the nodes both at the user and on the patch panel end. 
  • Shall remove the old cables, seal the holes and finally paint wall in accordance with the original  color code. The contractor should also consider properly rearranging the old cables in a proper  manner. 
  • Properly identify and label both ends of cables. 
  • Test and verify that each and every points are working. 
  • Submit detailed documentation of the installation, termination labels. 

Provide 1-year service guarantee after the acceptance test. 

CABLING & EQUIPMENT STANDARDS 

Cabling Standard Comply to:- 

  • ISO/IEC 11801:2002: International Standard for generic cabling for customer premises  EIA/TIA 568B: Commercial Building Telecommunications Cabling Standard (2002) EIA/TIA 568B.2-1: Commercial Building Telecommunication Cabling Standard (2002).  

DELIVERY PERIOD: 

The work has to be completed in not more than 15 days (February 01-15, 2024). Minimum organization and key personnel requirements  

Additional Remark /Conditions  

A site visit must be done to discuss necessary technical details and the requirements.  

SPECIFY THE BRAND OF MATERIALS SUPPLIED. 

The quality of the installation is subjected to ongoing inspection as the project progresses.

Annex 4 

Bill of quantity (BOQ) 

NO  FLOOR  DATA  Wi-Fi
Ground Floor
1st
2nd
Total

 

You may add as many rows as you can

10